10th of Ramadan LRT Station
Client: General Nile Company for Roads Construction
Scope: Structure Design Review | Shop Drawing | Project Management
Location: Cairo, Egypt
The LRT with 11 stations stretched over 65 km from the Adly Mansour interchange station to New Capital City.
Seven main parts divide the building: part B1, part B2, part T1, part T2, part L1, part L2, and part L3.
Part (B1, B2, T1, and T2) consists of three floors:
- the concourse floor at level +6.75m.
- the roof at level +12.40m.
- The upper roof is located at levels +14.75m and +15.10m.
Part (L1, L2, L3) consists of four floors:
- platform floor at level -0.10m.
- concourse floor at level +6.75m.
- roof at level +12.40m.
- upper roof at level +16.55m for part L2 only.