2021 - Current

26 July - Orabi Bridge

Client: Ministry of Transportation
Scope: Structural Design Review | Shop Drawing
Location: Giza, Egypt

The bridge is a concrete box girder and it serve the extension of the 26 July Highway Axis. Development work on the 26th of July Corridor - fourth sector, to link Sphinx Square and Al Barajeel Road:
1- The sector entrusted with the implementation work is the bridge at the intersection of the 26th of July Corridor with Orabi Bridge, with 816 meters in length and a width of 45 meters, connecting the rest of the sectors from Al-Barajeel Road down to the Airport Street.
2- The project includes 5 Rambats, the first with a length of 520 meters and a width of 11.5 meters, and it starts from Ahmed Orabi Street to the bridge body.
3- The second is 258 meters long and 26 meters wide, and it is a house from the bridge body to Ahmed Orabi Street.
4- The third is 134 meters long and 11.5 meters wide, starting from Airport Street to Ahmed Orabi Street.
5- The fourth is 92 meters long and 11.5 meters wide, starting from Airport Street to the bridge body.
6- The fifth is 100 meters long and 11.5 meters wide, it is a house from the bridge body to Al-Kilani Street.