MDF - Plant Factory
Client: NSPO
Scope: Structural Design | Supervision | Project Management
Location: Toushka, Egypt
The project is an industrial development aimed at reusing palm leaves and other materials by incorporating them into various manufacturing stages, including preparation, assembly, washing, chopping, and processing, until they are transformed into sheets of dough that can be used to produce heat-treated wood sheets. The project is located in Toshka, Egypt.
- Phase 1: An MDF–HDF factory with a capacity of 400 m³/day on a 23 feddan plot area.
- Phase 2: The remaining 77 feddan will be used for a factory that is part of a joint venture utilizing German technology.
- Phase 3: Bagasse wet storage.